Kenall provided construction management and design services for two significant projects along Austin Street in Houston’s Central Business District, spanning 12 blocks and 3,900 linear feet. These services included environmental site assessments, surveying, and geotechnical studies.
The projects involved reconstructing five lanes of concrete and asphalt pavement, upgrading and rehabilitating the storm sewer system, replacing utilities, enhancing landscapes, and installing modern streetlights and traffic signals. The work also featured the installation of 12-inch water lines, 12-inch and 18-inch wastewater lines, and new storm sewers, which effectively alleviated flooding across 900 acres of downtown Houston.
Kenall’s services included water and wastewater line engineering, pavement and storm drainage design, environmental site assessments (Phases I and II), topographic and right-of-way surveys, horizontal and vertical alignments, right-of-way mapping, and report preparation. The team also handled final construction drawings, specifications, cost estimates, bid phase assistance, construction phase services and construction management.
Client
City of Houston
Key Services
Civil and Structural Engineering, Environmental, Stormwater and Floodplain Management, Surveying
Sector
Budget
Related Projects
