Education - Sectors - Kenall https://www.kenallinc.com/projects-sectors/education/ Tue, 01 Jul 2025 15:49:43 +0000 en-US hourly 1 Galveston College Building and Pavement Construction https://www.kenallinc.com/project/galveston-college-buildings-and-pavements/ https://www.kenallinc.com/project/galveston-college-buildings-and-pavements/#respond Thu, 26 Oct 2017 04:56:46 +0000 https://www.gxtesting.com/kenall/?projects=galveston-college-buildings-and-pavements Kenall played a crucial role in the geotechnical engineering and construction materials testing for the development of multiple facilities at Galveston College. The team’s drilling and testing efforts ensured the successful completion of several significant projects, including a 15,000 SF addition, associated paving, and a new two-story, 10,000 SF concrete building addition. Kenall’s services involved…

The post Galveston College Building and Pavement Construction appeared first on Kenall.

]]>
Kenall played a crucial role in the geotechnical engineering and construction materials testing for the development of multiple facilities at Galveston College. The team’s drilling and testing efforts ensured the successful completion of several significant projects, including a 15,000 SF addition, associated paving, and a new two-story, 10,000 SF concrete building addition.

Kenall’s services involved performing soil borings at selected locations to evaluate subsurface stratigraphy and groundwater conditions. Laboratory tests were conducted in accordance with ASTM standards and local practices to assess the physical and engineering properties of subsurface soils. Additionally, geotechnical design parameters for foundation support systems were developed, and guidelines for earthwork, such as site preparation, grading, and fill compaction, were provided during construction.

The post Galveston College Building and Pavement Construction appeared first on Kenall.

]]>
https://www.kenallinc.com/project/galveston-college-buildings-and-pavements/feed/ 0
Lake Forest Elementary School New Construction https://www.kenallinc.com/project/new-lake-forest-elementary-school-construction/ https://www.kenallinc.com/project/new-lake-forest-elementary-school-construction/#respond Wed, 04 Oct 2017 03:57:29 +0000 https://www.gxtesting.com/kenall/?projects=new-lake-forest-elementary-school-construction The new Lake Forest Elementary School, a 125,000 SF facility, became a sign of resilience and progress in New Orleans as part of the $1.8 billion reconstruction and renovation of the city’s schools following the devastation of Hurricane Katrina. Kenall’s team delivered comprehensive services, including laboratory testing, field inspections, and pile load testing according to…

The post Lake Forest Elementary School New Construction appeared first on Kenall.

]]>
The new Lake Forest Elementary School, a 125,000 SF facility, became a sign of resilience and progress in New Orleans as part of the $1.8 billion reconstruction and renovation of the city’s schools following the devastation of Hurricane Katrina.

Kenall’s team delivered comprehensive services, including laboratory testing, field inspections, and pile load testing according to the design engineer’s specifications. They also calculated essential geotechnical design parameters for the typical foundation supporting system and provided detailed guidelines for earthwork during construction, including site preparation, grading, and fill compaction.

This vital project, funded by a federal disaster declaration, was administered in compliance with federal regulations and GLO/FEMA guidelines, demonstrating Kenall’s dedication and commitment to the community and its students and educators.

The post Lake Forest Elementary School New Construction appeared first on Kenall.

]]>
https://www.kenallinc.com/project/new-lake-forest-elementary-school-construction/feed/ 0
Martin Luther King, Jr. High School Construction https://www.kenallinc.com/project/new-alfred-lawless-high-school-construction/ https://www.kenallinc.com/project/new-alfred-lawless-high-school-construction/#respond Wed, 04 Oct 2017 03:57:29 +0000 https://www.gxtesting.com/kenall/?projects=new-alfred-lawless-high-school-construction Kenall had been instrumental in the ongoing reconstruction and renovation of New Orleans schools following Hurricane Katrina, demonstrating unwavering commitment to Lower Ninth Ward’s students. Another project completed by the team for City of New Orleans schools involved the new construction of the Martin Luther King, Jr. High School (former Alfred Lawless High School). This…

The post Martin Luther King, Jr. High School Construction appeared first on Kenall.

]]>
Kenall had been instrumental in the ongoing reconstruction and renovation of New Orleans schools following Hurricane Katrina, demonstrating unwavering commitment to Lower Ninth Ward’s students. Another project completed by the team for City of New Orleans schools involved the new construction of the Martin Luther King, Jr. High School (former Alfred Lawless High School). This 195,000 SF facility was part of the massive $1.8 billion initiative to restore educational infrastructure in the city.

Comprehensive construction materials testing and pile load testing services were carried out by Kenall’s team, coordinating and conducting field monitoring, testing, and inspections, while ensuring compliance with design engineering specifications. Their work included inspecting precast concrete piles at the plant, examining steel rebar and concrete forms, and overseeing the installation of piles with vibration monitoring of surrounding structures. Additionally, Kenall conducted both field and laboratory testing of various construction materials, including steel, concrete, and welds.

Through their ongoing commitment and dedication to the community, Kenall played a vital role in rebuilding New Orleans’ educational facilities, providing students with the necessary resources to learn and thrive at school.

The post Martin Luther King, Jr. High School Construction appeared first on Kenall.

]]>
https://www.kenallinc.com/project/new-alfred-lawless-high-school-construction/feed/ 0
North Kenilworth Park PreK-8 School Construction https://www.kenallinc.com/project/new-prek-8-school-construction-at-north-kenilworth-park/ https://www.kenallinc.com/project/new-prek-8-school-construction-at-north-kenilworth-park/#respond Wed, 04 Oct 2017 03:57:29 +0000 https://www.gxtesting.com/kenall/?projects=new-prek-8-school-construction-at-north-kenilworth-park Kenall played a vital role in supporting the Ninth Ward community post-Hurricane Katrina, providing key engineering and testing services for the new LEED Silver North Kenilworth School. The school is a three-floor, 105,000 SF facility serving 850 Pre-Kindergarten through 8th grade students. Kenall provided comprehensive laboratory testing, construction materials testing, geotechnical engineering, and pile load…

The post North Kenilworth Park PreK-8 School Construction appeared first on Kenall.

]]>
Kenall played a vital role in supporting the Ninth Ward community post-Hurricane Katrina, providing key engineering and testing services for the new LEED Silver North Kenilworth School. The school is a three-floor, 105,000 SF facility serving 850 Pre-Kindergarten through 8th grade students.

Kenall provided comprehensive laboratory testing, construction materials testing, geotechnical engineering, and pile load testing services in accordance with specifications provided by the design team. Their engineers developed geotechnical design parameters for the project’s foundation and provided guidelines for earthwork, including site preparation, grading, and fill compaction.

This project was part of the Hurricane Katrina Disaster Recovery initiative, funded under a federal disaster declaration and administered in compliance with federal regulations and GLO/FEMA guidelines. Kenall’s work highlighted their commitment to sustainability, education, and ongoing community support in the aftermath of the hurricane.

The post North Kenilworth Park PreK-8 School Construction appeared first on Kenall.

]]>
https://www.kenallinc.com/project/new-prek-8-school-construction-at-north-kenilworth-park/feed/ 0
New Arts and Sciences Building at Southern University of New Orleans (SUNO) https://www.kenallinc.com/project/new-arts-and-sciences-building/ https://www.kenallinc.com/project/new-arts-and-sciences-building/#respond Wed, 04 Oct 2017 03:57:29 +0000 https://www.gxtesting.com/kenall/?projects=new-arts-and-sciences-building In the aftermath of Hurricane Katrina, Southern University of New Orleans launched a significant reconstruction project, funded by FEMA, to restore and improve its educational facilities. This included demolishing the old arts and science building and constructing a modern three-story facility, part of a larger four-building plan. Kenall played a crucial role by providing geotechnical…

The post New Arts and Sciences Building at Southern University of New Orleans (SUNO) appeared first on Kenall.

]]>
In the aftermath of Hurricane Katrina, Southern University of New Orleans launched a significant reconstruction project, funded by FEMA, to restore and improve its educational facilities. This included demolishing the old arts and science building and constructing a modern three-story facility, part of a larger four-building plan.

Kenall played a crucial role by providing geotechnical services and testing, including core drilling, soil sampling, and laboratory testing. They developed essential design parameters for the foundation and guidelines for earthwork, ensuring an efficient and sustainable construction process. As part of the ongoing rebuilding process, Kenall’s efforts were instrumental in revitalizing New Orleans’ many K-12 and higher educational institutions.

The post New Arts and Sciences Building at Southern University of New Orleans (SUNO) appeared first on Kenall.

]]>
https://www.kenallinc.com/project/new-arts-and-sciences-building/feed/ 0
Code, Life Safety and ADA Compliance Upgrades for Elementary Schools https://www.kenallinc.com/project/code-life-safety-and-ada-compliance-upgrades-for-elementary-schools/ https://www.kenallinc.com/project/code-life-safety-and-ada-compliance-upgrades-for-elementary-schools/#respond Wed, 04 Oct 2017 03:57:23 +0000 https://www.gxtesting.com/kenall/?projects=code-life-safety-and-ada-compliance-upgrades-for-elementary-schools Kenall addressed life safety, fire, and code compliance concerns for four schools in the Houston Independent School District: Blanche K. Bruce Elementary School, Hamilton Elementary School, Scarborough Elementary School, and Lee High School. The architectural solutions implemented were tailored to meet local jurisdictional requirements and enhance overall safety and accessibility. These efforts ensured compliance with…

The post Code, Life Safety and ADA Compliance Upgrades for Elementary Schools appeared first on Kenall.

]]>
Kenall addressed life safety, fire, and code compliance concerns for four schools in the Houston Independent School District: Blanche K. Bruce Elementary School, Hamilton Elementary School, Scarborough Elementary School, and Lee High School. The architectural solutions implemented were tailored to meet local jurisdictional requirements and enhance overall safety and accessibility. These efforts ensured compliance with local, state, and federal building codes by adhering to structural, electrical, mechanical, and plumbing standards, as well as obtaining all necessary permits.

Life safety modifications included the installation of fire protection systems such as sprinklers, fire alarms, and portable extinguishers, following NFPA standards and Houston Fire Department guidelines, along with emergency lighting, illuminated exit signs, and clear egress pathways for safe evacuation during emergencies. ADA compliance was achieved through accessible routes like ramps, elevators, and wide doorways, as well as improvements to restroom facilities and classrooms to accommodate individuals with disabilities.

In addition to these upgrades, Kenall implemented safety training programs for staff and students to promote emergency preparedness, established routine maintenance schedules for safety equipment and accessible features, and collaborated with local authorities to ensure ongoing compliance and to address any emerging safety concerns.

The post Code, Life Safety and ADA Compliance Upgrades for Elementary Schools appeared first on Kenall.

]]>
https://www.kenallinc.com/project/code-life-safety-and-ada-compliance-upgrades-for-elementary-schools/feed/ 0
Lawrence E. Elkins High School Science Laboratory Modernization https://www.kenallinc.com/project/elkins-high-school-science-laboratory-modernization/ https://www.kenallinc.com/project/elkins-high-school-science-laboratory-modernization/#respond Wed, 04 Oct 2017 03:57:23 +0000 https://www.gxtesting.com/kenall/?projects=elkins-high-school-science-laboratory-modernization Kenall led the architectural design to modernize the science laboratories at Lawrence E. Elkins High School, elevating the learning environment for both students and teachers. This project converted twelve existing science classrooms into six state-of-the-art general science laboratories, an innovative aquatics laboratory, a cutting-edge chemical storage facility, and additional preparation areas. The initiative also included…

The post Lawrence E. Elkins High School Science Laboratory Modernization appeared first on Kenall.

]]>
Kenall led the architectural design to modernize the science laboratories at Lawrence E. Elkins High School, elevating the learning environment for both students and teachers. This project converted twelve existing science classrooms into six state-of-the-art general science laboratories, an innovative aquatics laboratory, a cutting-edge chemical storage facility, and additional preparation areas. The initiative also included the upgrade of eight existing laboratories, equipping them with the latest digital data networking technologies. Our architectural solutions were designed in compliance with the latest life safety, fire, and ADA requirements.

Kenall provided programming, design, and construction services while managing every aspect of the project, from laboratory casework to digital infrastructure. The team’s efforts ensured that each space was primed for fostering curiosity and innovation, allowing students to explore new advancements in science and technology.

The post Lawrence E. Elkins High School Science Laboratory Modernization appeared first on Kenall.

]]>
https://www.kenallinc.com/project/elkins-high-school-science-laboratory-modernization/feed/ 0
Houston Independent School District Food Service Facility https://www.kenallinc.com/project/houston-independent-school-district-food-service-facility/ https://www.kenallinc.com/project/houston-independent-school-district-food-service-facility/#respond Wed, 04 Oct 2017 03:57:23 +0000 https://www.gxtesting.com/kenall/?projects=houston-independent-school-district-food-service-facility Kenall provided critical engineering services associated with the rehabilitation of the Houston Independent School District Food Service Facility’s ammonia refrigeration system. This project was carefully phased to maintain continuous operation of the facility and involved the replacement of nine refrigeration compressors and one evaporative condenser, which served three freezers and four refrigerated coolers. Architectural and…

The post Houston Independent School District Food Service Facility appeared first on Kenall.

]]>
Kenall provided critical engineering services associated with the rehabilitation of the Houston Independent School District Food Service Facility’s ammonia refrigeration system. This project was carefully phased to maintain continuous operation of the facility and involved the replacement of nine refrigeration compressors and one evaporative condenser, which served three freezers and four refrigerated coolers. Architectural and engineering services included site investigation, life safety and code compliance upgrades and design, code review, inspection and testing. In addition to the services provided, Kenall also managed the demolition and conversion of an existing garage space into a mechanical space to accommodate the new equipment.

The phased approach adopted by Kenall ensured that the facility’s operation was uninterrupted, maintaining continued service to students during the upgrades, demolition, and replacement processes.

The post Houston Independent School District Food Service Facility appeared first on Kenall.

]]>
https://www.kenallinc.com/project/houston-independent-school-district-food-service-facility/feed/ 0