Transportation - Sectors - Kenall https://www.kenallinc.com/projects-sectors/transportation/ Thu, 17 Jul 2025 15:31:03 +0000 en-US hourly 1 Santa Fe Access Control Point (ACP) Exit Roadway Widening https://www.kenallinc.com/project/santa-fe-access-control-point-acp-exit-roadway-widening-fort-cavazos-tx/ Wed, 25 Jun 2025 07:13:00 +0000 https://www.kenallinc.com/?post_type=project&p=24935 The Santa Fe Access Control Point (ACP) roadway widening project improved traffic flow and access control by adding an additional outbound lane to an 800 LF stretch of roadway. The widened section extended from the intersection of Santa Fe Avenue and Wratten Drive to its merger with the T.J. Mills Boulevard circulation ramps. As a…

The post Santa Fe Access Control Point (ACP) Exit Roadway Widening appeared first on Kenall.

]]>
The Santa Fe Access Control Point (ACP) roadway widening project improved traffic flow and access control by adding an additional outbound lane to an 800 LF stretch of roadway. The widened section extended from the intersection of Santa Fe Avenue and Wratten Drive to its merger with the T.J. Mills Boulevard circulation ramps. As a key entry control point for the main cantonment area, the Santa Fe ACP required upgrades to meet growing traffic demands.

The project included demolition, new pavement, adjustments to the outbound Active Vehicle Barrier (AVB), and roadway geometry changes. Traffic signals, signs, and pavement markings were upgraded, while guardrails were extended, fences modernized, and stormwater systems enhanced. Completed in accordance with Unified Facilities Criteria and Army Design Criteria, the project addressed issues identified in a 2018 traffic study and improved overall efficiency.

The post Santa Fe Access Control Point (ACP) Exit Roadway Widening appeared first on Kenall.

]]>
Mandeville Bypass Construction https://www.kenallinc.com/project/mandeville-bypass-construction/ https://www.kenallinc.com/project/mandeville-bypass-construction/#respond Wed, 04 Oct 2017 03:57:29 +0000 https://www.gxtesting.com/kenall/?projects=mandeville-bypass-construction Tasked with providing geotechnical engineering services for a new $34 million bypass—spanning 3.5 miles and linking US 190 with LA 1088—Kenall’s investigation and design efforts enhanced safety and accessibility to key locations such as Pelican Park and Fontainebleau State Park. Comprising a two-lane divided roadway, including five bridges and culverts, the project advanced one of…

The post Mandeville Bypass Construction appeared first on Kenall.

]]>
Tasked with providing geotechnical engineering services for a new $34 million bypass—spanning 3.5 miles and linking US 190 with LA 1088—Kenall’s investigation and design efforts enhanced safety and accessibility to key locations such as Pelican Park and Fontainebleau State Park. Comprising a two-lane divided roadway, including five bridges and culverts, the project advanced one of the largest roadway projects in St. Tammany Parish history.

Through detailed soil investigations, laboratory testing, and design recommendations for foundations, drainage, and pavement, Kenall turned project challenges into solutions that addressed long-standing traffic concerns in the community.

The post Mandeville Bypass Construction appeared first on Kenall.

]]>
https://www.kenallinc.com/project/mandeville-bypass-construction/feed/ 0
Franz Road Reconstruction, Primewest Parkway East to Mason Road https://www.kenallinc.com/project/franz-road-reconstruction-east-of-primewest-parkway-to-mason-rd/ https://www.kenallinc.com/project/franz-road-reconstruction-east-of-primewest-parkway-to-mason-rd/#respond Wed, 04 Oct 2017 03:57:26 +0000 https://www.gxtesting.com/kenall/?projects=franz-road-reconstruction-east-of-primewest-parkway-to-mason-rd Kenall delivered comprehensive civil and geotechnical engineering design, surveying, and environmental services for the Franz Road project, spanning from east of Primewest Parkway to Mason Road. The project involved reconstructing and widening 3,200 linear feet of the existing two-lane roadway into a four-lane divided concrete curb-and-gutter roadway. The team conducted feasibility studies, prepared the preliminary…

The post Franz Road Reconstruction, Primewest Parkway East to Mason Road appeared first on Kenall.

]]>
Kenall delivered comprehensive civil and geotechnical engineering design, surveying, and environmental services for the Franz Road project, spanning from east of Primewest Parkway to Mason Road. The project involved reconstructing and widening 3,200 linear feet of the existing two-lane roadway into a four-lane divided concrete curb-and-gutter roadway.

The team conducted feasibility studies, prepared the preliminary engineering report, and managed the environmental assessment, hydraulic analysis, alignment geometrics, and utility relocation. They also identified right-of-way requirements and developed detailed plans, specifications, and cost estimates.

The post Franz Road Reconstruction, Primewest Parkway East to Mason Road appeared first on Kenall.

]]>
https://www.kenallinc.com/project/franz-road-reconstruction-east-of-primewest-parkway-to-mason-rd/feed/ 0
Sam Houston Tollway South, Section No. 8 https://www.kenallinc.com/project/sam-houston-tollway-south-section-no-8/ https://www.kenallinc.com/project/sam-houston-tollway-south-section-no-8/#respond Wed, 04 Oct 2017 03:57:26 +0000 https://www.gxtesting.com/kenall/?projects=sam-houston-tollway-south-section-no-8 Kenall played a major role, serving as the prime consultant, for the Harris County Toll Road Authority’s one-mile stretch of controlled-access freeway. This vital infrastructure project involved the design and execution of two significant bridges: a 320-foot-long bridge spanning South Post Oak and a 116-foot-long bridge at HCFCD Ditch Unit C-145-00-00. Their responsibilities included field…

The post Sam Houston Tollway South, Section No. 8 appeared first on Kenall.

]]>
Kenall played a major role, serving as the prime consultant, for the Harris County Toll Road Authority’s one-mile stretch of controlled-access freeway. This vital infrastructure project involved the design and execution of two significant bridges: a 320-foot-long bridge spanning South Post Oak and a 116-foot-long bridge at HCFCD Ditch Unit C-145-00-00.

Their responsibilities included field surveying, utility relocation plans and profiles, roadway design, drainage design using THYSYS, retaining wall design, stormwater pollution prevention planning, and detailed roadway cross-sections. Kenall also managed bridge layout and design with STAAD III, traffic control plans, specification adjustments, quantity summaries, and construction cost estimates. Their expertise and thorough approach helped to manage complex infrastructure challenges and deliver the project successfully.

The post Sam Houston Tollway South, Section No. 8 appeared first on Kenall.

]]>
https://www.kenallinc.com/project/sam-houston-tollway-south-section-no-8/feed/ 0
Westpark Toll Road, Section 4 https://www.kenallinc.com/project/westpark-toll-road-section-4/ https://www.kenallinc.com/project/westpark-toll-road-section-4/#respond Wed, 04 Oct 2017 03:57:26 +0000 https://www.gxtesting.com/kenall/?projects=westpark-toll-road-section-4 Designed to improve connectivity, the 3,700 linear foot Westpark Toll Road project introduced a 4-lane toll road and bridge to support Harris County and the region’s growing needs. Kenall led the engineering efforts for the project, including developing the bridge layout at Dairy Ashford and creating plans for bridge retaining walls. Their project tasks involved…

The post Westpark Toll Road, Section 4 appeared first on Kenall.

]]>
Designed to improve connectivity, the 3,700 linear foot Westpark Toll Road project introduced a 4-lane toll road and bridge to support Harris County and the region’s growing needs.

Kenall led the engineering efforts for the project, including developing the bridge layout at Dairy Ashford and creating plans for bridge retaining walls. Their project tasks involved subsurface exploration, soil testing, engineering analysis, foundation recommendations, control surveys, and preparing construction drawings and specifications at various stages—30%, 60%, 90%, and 100%. They also provided cost estimates and carried out the required environmental assessment to ensure compliance.

The post Westpark Toll Road, Section 4 appeared first on Kenall.

]]>
https://www.kenallinc.com/project/westpark-toll-road-section-4/feed/ 0
Magnolia Transit Center Modifications https://www.kenallinc.com/project/magnolia-transit-center-modifications/ https://www.kenallinc.com/project/magnolia-transit-center-modifications/#respond Wed, 04 Oct 2017 03:57:26 +0000 https://www.gxtesting.com/kenall/?projects=magnolia-transit-center-modifications Kenall’s work brought significant improvements to the METRO Magnolia Transit Center, enhancing both its functionality and aesthetic appeal for the community. Their design efforts introduced a more accessible environment through site grading, the creation of a replacement parking lot, upgrades to the concrete platform, and the renovation and replacement of sidewalks and driveways. Kenall provided…

The post Magnolia Transit Center Modifications appeared first on Kenall.

]]>
Kenall’s work brought significant improvements to the METRO Magnolia Transit Center, enhancing both its functionality and aesthetic appeal for the community. Their design efforts introduced a more accessible environment through site grading, the creation of a replacement parking lot, upgrades to the concrete platform, and the renovation and replacement of sidewalks and driveways.

Kenall provided thoughtful design solutions, adding visually appealing patterned concrete, sturdy ornamental security fence foundations, and reliable foundations for brick posts and light poles. These enhancements, coupled with structural updates to the platform and handicap-accessible ramps, fostered a more inclusive and attractive transit center that better serves the community’s needs.

The post Magnolia Transit Center Modifications appeared first on Kenall.

]]>
https://www.kenallinc.com/project/magnolia-transit-center-modifications/feed/ 0
Mississippi River Ferry Terminal and Associated Hurricane and Storm Damage Reduction Improvements https://www.kenallinc.com/project/regional-transit-authority-canal-street-ferry-terminal-construction/ https://www.kenallinc.com/project/regional-transit-authority-canal-street-ferry-terminal-construction/#respond Wed, 04 Oct 2017 03:57:26 +0000 https://www.gxtesting.com/kenall/?projects=regional-transit-authority-canal-street-ferry-terminal-construction Kenall played a pivotal role in providing design and construction management services for the renovation of flood protection system structures that included I-wall, revetments and new buildings of the Canal Street Ferry Terminal for the New Orleans Regional Transit Authority. The project consisted of renovations of flood protection system at the ferry terminal, demolition of…

The post Mississippi River Ferry Terminal and Associated Hurricane and Storm Damage Reduction Improvements appeared first on Kenall.

]]>
Kenall played a pivotal role in providing design and construction management services for the renovation of flood protection system structures that included I-wall, revetments and new buildings of the Canal Street Ferry Terminal for the New Orleans Regional Transit Authority. The project consisted of renovations of flood protection system at the ferry terminal, demolition of the ferry terminal building, and design and construction of a new ferry terminal building to improve New Orleans riverfront at Canal Street and Mississippi river.

Kenall’s responsibilities involved providing extensive design and specifications for the project with tasks consisting of pile supported floodwall and building, I-wall stability and seepage analysis and revetment design, and geotechnical engineering services including installing and sampling cone penetration tests and standard penetration test borings from both river barge and landside locations, reaching depths of up to 120 feet. They provided archaeological desktop survey and cultural investigation of soil samples per Louisiana SHPO. They conducted basic and advanced laboratory testing, performed detailed engineering analyses, and provided technical expertise for the development of recommendations for bulkheads, foundations, retaining walls, and pavement designs integrated into project plans and specifications. Kenall also managed construction activities for this project.

The post Mississippi River Ferry Terminal and Associated Hurricane and Storm Damage Reduction Improvements appeared first on Kenall.

]]>
https://www.kenallinc.com/project/regional-transit-authority-canal-street-ferry-terminal-construction/feed/ 0
Austin Street Paving and Drainage Improvements https://www.kenallinc.com/project/austin-street-paving-and-drainage-improvements/ https://www.kenallinc.com/project/austin-street-paving-and-drainage-improvements/#respond Wed, 04 Oct 2017 03:57:23 +0000 https://www.gxtesting.com/kenall/?projects=austin-street-paving-and-drainage-improvements Kenall provided construction management and design services for two significant projects along Austin Street in Houston’s Central Business District, spanning 12 blocks and 3,900 linear feet. These services included environmental site assessments, surveying, and geotechnical studies. The projects involved reconstructing five lanes of concrete and asphalt pavement, upgrading and rehabilitating the storm sewer system, replacing…

The post Austin Street Paving and Drainage Improvements appeared first on Kenall.

]]>
Kenall provided construction management and design services for two significant projects along Austin Street in Houston’s Central Business District, spanning 12 blocks and 3,900 linear feet. These services included environmental site assessments, surveying, and geotechnical studies.

The projects involved reconstructing five lanes of concrete and asphalt pavement, upgrading and rehabilitating the storm sewer system, replacing utilities, enhancing landscapes, and installing modern streetlights and traffic signals. The work also featured the installation of 12-inch water lines, 12-inch and 18-inch wastewater lines, and new storm sewers, which effectively alleviated flooding across 900 acres of downtown Houston.

Kenall’s services included water and wastewater line engineering, pavement and storm drainage design, environmental site assessments (Phases I and II), topographic and right-of-way surveys, horizontal and vertical alignments, right-of-way mapping, and report preparation. The team also handled final construction drawings, specifications, cost estimates, bid phase assistance, construction phase services and construction management.

The post Austin Street Paving and Drainage Improvements appeared first on Kenall.

]]>
https://www.kenallinc.com/project/austin-street-paving-and-drainage-improvements/feed/ 0
Pinemont Drive Paving and Drainage Improvements https://www.kenallinc.com/project/pinemont-drive-paving-and-drainage-improvements/ https://www.kenallinc.com/project/pinemont-drive-paving-and-drainage-improvements/#respond Wed, 04 Oct 2017 03:57:23 +0000 https://www.gxtesting.com/kenall/?projects=pinemont-drive-paving-and-drainage-improvements Kenall played a key role in transforming Pinemont Drive in Houston, through a series of infrastructure improvement projects. These efforts involved widening 2,500 linear feet of roadway, upgrading 8,000 linear feet of water and sanitary sewer lines, enhancing drainage and pavement systems, and converting five miles of 2-lane asphalt road into a 4-lane thoroughfare. Their…

The post Pinemont Drive Paving and Drainage Improvements appeared first on Kenall.

]]>
Kenall played a key role in transforming Pinemont Drive in Houston, through a series of infrastructure improvement projects. These efforts involved widening 2,500 linear feet of roadway, upgrading 8,000 linear feet of water and sanitary sewer lines, enhancing drainage and pavement systems, and converting five miles of 2-lane asphalt road into a 4-lane thoroughfare.

Their scope of work included replacing 3,000 linear feet of 8–20-inch waterlines, 5,000 linear feet of 10–15-inch sanitary sewer lines, and 2,000 linear feet of concrete box storm sewers, upgrading fire hydrants, and adding dedicated left-turn lanes. Kenall’s services also included environmental assessments, preliminary engineering and drainage designs, final project designs, and on-site construction-phase support.

The post Pinemont Drive Paving and Drainage Improvements appeared first on Kenall.

]]>
https://www.kenallinc.com/project/pinemont-drive-paving-and-drainage-improvements/feed/ 0
Fort Cavazos Stadium and Sports Complex Traffic Study https://www.kenallinc.com/project/fort-cavazos-stadium-and-sports-complex-traffic-study-fort-cavazos-tx/ Sun, 25 Jun 2017 06:54:39 +0000 https://www.kenallinc.com/?post_type=project&p=24921 Kenall conducted a comprehensive traffic study to improve public access to the Fort Cavazos (former Fort Hood) Stadium and Sports Complex without breaching the secure perimeter of the post. The evaluation emphasized security measures at key access control points (ACPs) to develop a traffic management system capable of adapting to special event demands. The study…

The post Fort Cavazos Stadium and Sports Complex Traffic Study appeared first on Kenall.

]]>
Kenall conducted a comprehensive traffic study to improve public access to the Fort Cavazos (former Fort Hood) Stadium and Sports Complex without breaching the secure perimeter of the post. The evaluation emphasized security measures at key access control points (ACPs) to develop a traffic management system capable of adapting to special event demands. The study involved extensive analysis of existing traffic conditions near Clear Creek ACP and Santa Fe ACP, addressing traffic impacts and congestion.

Clear Creek ACP was the focal point for determining traffic patterns and impacts, while operations at Santa Fe ACP were studied for alleviating congestion. Traffic counts were established through strategic placement of meters during various times, including before and after sporting events.
The findings were presented in an engineering report, which included a comprehensive traffic management plan, conceptual layouts for proposed alternatives, drainage analysis, fencing plans, and decision briefs with recommendations tailored to both ACPs. Conceptual layouts incorporated features such as a new parking lot for the stadium. Environmental data from the Clear Creek ACP area was analyzed to assess potential impacts of the proposed developments, while cost estimates for all alternatives were carefully prepared. Security and accessibility remained at the core of the proposed solutions. Work performed on this project was completed under the Kenall-Freese & Nichols 8a Mentor-Protégé Joint Venture (KFNI JV).